Sunday, January 3, 2010
Finished the outside
Ahh the last piece of trim and gutter was installed on the outside in this picture. Well almost. Need to put in a couple of pop rivits top hold the gutters on. But it is finished here. Will put down a gravel drive way to stop the mud from getting in so bad.
Tuesday, November 3, 2009
Doors
Here it with doors. Altho the insulation is not there yet. It looks better with doors. Should keep out the water and the bugs.
Don Littlefield
Doors at last
Finally got the doors delivered and installed them. Had a minor problem with the installation of the doors. The instructions say to use a light weight perforated angle iron to support the back of the door when it is in the open position. It was much too weak so we fabed a stronger angle iron bracket that works much better. Looks pretty good now. The doors they delivered did not have any insulation in them. So called again with more problems. The company is going to UPS the insulation and new springs for the extra weight. They are supposed to call with a delivery date some time today. Hope it isnt long on the delivery.
The last piece of gutter still is not here. I think is is suppose to be here this afternoon.
In the next few days we will go to Portland and Merle Point for a couple of weeks.
The last piece of gutter still is not here. I think is is suppose to be here this afternoon.
In the next few days we will go to Portland and Merle Point for a couple of weeks.
Thursday, October 22, 2009
Building Electrical
Hello again. I have finished putting in the electrical and am still waiting on the doors. Now to be delivered on Tuesday. The gutters have been installed mostly. One piece of the gutter was formed wrong and it is being replaced. I just got a call and it is to be delivered today in the rain. Must be the guy that came here before and had a hard time getting out of here with his truck. Said come to town for the item. He would not come to my place to deliver. More next time.
Don Littlefield
Don Littlefield
Tuesday, October 6, 2009
Electrical Stuff
Lee and I went to Home Depot and got the electrical parts for the building yesterday. Now we have to put it up so we can have lights and power. Cool Huh.....
Today Jeannie and Doris went with me to Oklahoma City to get the gutters and downspouts for the building. Now we got lots of stuff to work with. Lots of fun now.
I finally got the info on the doors. they are to be delivered to Fort Smith on the 23rd. Then delivered here after that.
Don Littlefield
Sunday, September 27, 2009
Building update
I have ordered the rain gutters and downspouts to add to the building.
I did not think about them when I first ordered the building. They will make a big difference in the front. Right now the rain is digging at the foundation a little every time it rains. I will go pick up the gutters in OK city next week I think.
I did not think about them when I first ordered the building. They will make a big difference in the front. Right now the rain is digging at the foundation a little every time it rains. I will go pick up the gutters in OK city next week I think.
The problem with the doors seems to be resolved. They are going to replace the doors with ones built for a steel building. The ones they delivered are for a wooden building. They will be here some time after next week.
Saturday, September 19, 2009
Door openers

This time I have installed the door openers. When the correct doors arrive I can hook them up. I cant run the wires to the safety switches yet cause they run on the tracks which are not here yet. They are going to change them out for the Steel Building kind instead of the wood building. Just not the same at all. The track mounting is different and the door panels are not the same either. I bet the hardware is different also.
Found a leak in all this rain. When I got on top I found a screw loose and tightend it up and it stopped the leak. Of course it rained more to check the leak repair.
Thursday, September 10, 2009
Monday, August 31, 2009
Sunday, August 30, 2009

Saturday, August 29, 2009
4 walls up

Here we go. Nearly have completed the 4 walls here. They shorted me 4 pieces of trim for the top of the wall so can only do about a 1/3 of the roof till they get here. They were supposed to be shipped on the 26th and should have been here yesterday. I called and they got put off till Monday. It goes at the top edge of the front wall. Started working on the roof sheets getting them ready to put up yesterday.
Sunday, August 23, 2009
Saturday, August 22, 2009
Thursday, August 20, 2009
Here is the back wall going up. Still is not finished.
Had to stop here for a rain. Sure slows down the progress
And some more the next day.

A few more sheets and some are even getting installed straight and smooth.
This is the first piece of insulation and the first sheet of metal on the siding. Well it was not too bad. The other side is in the shade so it is hard to see.

It is hard to put all the pics on the page at one time. Here is some more.
It is hard to put all the pics on the page at one time. Here is some more.
starting on insulatin and sheeting the outside

It is big and is hard to position real close to where you want it. Leaks lots less now anyway. Only is leaking from the Power stearing cylinder on one side now. I will have to fix that too I guess.


Ok Ok lets get started. Now that you are up there. Looking down from up on the lift.



Saturday, August 15, 2009
Saterday IT is a week today
Wednesday, August 12, 2009
Tuesday at the shop
Well we had a little scare when we got up to find it rained all night. Was worried about the insulation getting wet. That is a bad no no. Turned out the tarp and the plastic kept out most of the rain. We were able to get up more of the purlings on the rafters. That is the cross wise beams that the roof sheets will be screwed to. Work seems to go fast but the day goes faster. Just cant keep up with the clock.
Don Littlefield
Tuesday, August 11, 2009
More pics of the shop building
Now it started raining. I hope the insulation dont get to wet.


Friday, July 31, 2009
Gardening
Here are some more pics of the Garden. There is the Corn patch behind the tire garden Beans.
You can see the Purple Hull Peas on the fence in the back. Cantaloupes in the middle and the Asparagus in the front. Hope the Asparagus will be ready to start eating next year. Takes at least three years to get old enough to eat.

Here is another tire garden of Green Beens.
Just look at the size of them peas and they are not ready yet. They will turn purple when ready. Looks good enough to eat now to me.
Jeannie and Lee did almost all of this garden because I was off working when it needed to be planted.
Here is another tire garden of Green Beens.
Just look at the size of them peas and they are not ready yet. They will turn purple when ready. Looks good enough to eat now to me.
Jeannie and Lee did almost all of this garden because I was off working when it needed to be planted.
Subscribe to: